RO certification dossier index — the complete QI review pack

RO certification dossier index — the complete QI review pack

Use this dossier index to assemble a reviewer-ready pack for the Responsible Officer (RO) certification. It standardizes folders, file names, and mandatory attachments so your QI periodic review can be uploaded, reviewed, and approved without back-and-forth.

Outcome: one master ZIP (e.g., QI_Dossier_BankName_2025_v1.zip) whose internal paths match the evidence map referenced in the review report.

1) Folder index & file naming

Use numeric prefixes to keep order. All paths below should be referenced in the review report’s evidence map.

Folder Contents (examples) File name patterns
01_governance Independence pack, acceptance memo, team bios independence_pack.pdf, acceptance_memo.pdf
02_method Sampling plan workbook, RNG log, selection list sampling_plan.xlsx, rng_log.pdf
03_results Documentation tests (WPs), payments/withholding tests documentation_tests/WP_DOC_####.pdf
payments_tests/WP_PAY_####.pdf
04_recon 1042-S aggregation, 1042 mapping, GL roll-forward, bridge 1042S_agg.xlsx, form1042_map.xlsx, gl_rollforward.xlsx, bridge_signed.pdf
05_findings Findings register, remediation plan, validation evidence findings_register.xlsx, validation_memo.pdf
06_report Searchable PDF of the review report with bookmarks QI_review_report_v1.pdf

Versioning: if you must re-issue, increment suffixes consistently (e.g., _v2) across report and any updated files; update the evidence map accordingly.

2) Mandatory attachments (minimum set)

  • Independence pack — acceptance memo, conflict checks, team bios.
  • Sampling plan workbook — populations, strata, RNG seed/log, selections.
  • Working papers — pass/fail per sample with evidence links or bundled PDFs.
  • Reconciliations — 1042-S → Form 1042 → GL bridge, roll-forward, signatures.
  • Findings & remediation — register with owner/ETA and validation plan.
  • Review report (PDF/A) — bookmarks/ToC, evidence map section.

3) Evidence map (how paths should appear)

Your report should contain a table like this (pointing to files inside the ZIP):

Ref ID Report section ZIP file path Notes
GOV-01 Governance & independence 01_governance/independence_pack.pdf Acceptance memo + conflicts
MET-01 Method 02_method/sampling_plan.xlsx Populations, RNG log, selections
REC-01 Reconciliation 04_recon/bridge_signed.pdf 1042-S → 1042 → GL with sign-offs

Keep casing and paths identical. If anything changes, update both the report and the ZIP.

4) Sign-offs (who approves what)

  • Review engagement partner/lead: independence confirmation, scope, results.
  • Tax lead/controller: 1042-S/1042 tie-outs, GL reconciliations, corrections.
  • Process owner(s): remediation actions, ETA, validation evidence.
  • RO: final certification representation (with disclosure where applicable).

Capture signatures or email approvals as a consolidated sign-off pack (PDF) in 06_report/ or 01_governance/.

5) Submission timeline (working back from RO due date)

  1. T-10 weeks: finalize scope & independence; freeze populations; prepare sampling plan.
  2. T-8 to T-4: fieldwork — documentation & payments testing; early reconciliations.
  3. T-3: draft report; findings & remediation; start sign-offs; corrections if any.
  4. T-2: finalize bridge and GL roll-forward; package ZIP; Run pre-flight checks.
  5. T-1: RO review session; finalize disclosure language; QAAMS upload.
  6. T (RO due): certification submitted; archive dossier in records management.

6) Pre-flight (pass/fail in five minutes)

  • ZIP opens; paths match evidence map exactly.
  • Report is searchable, bookmarked, and references the latest file names.
  • Sampling: RNG seed/date present; selections reconcile to populations.
  • Bridge: 1042-S totals = 1042 lines = GL (timing explained).
  • Findings: owners + ETA + validation plan; no placeholders.
  • Privacy: PII minimized/redacted; no live system links or keys.
Starter templates
Report (DOCX), Evidence Map (XLSX), Findings Register (XLSX), Sampling Plan (XLSX), 1042-S Bridge (XLSX), 1446(f) Logic Pack (XLSX).
Want a done-for-you dossier?
We’ll assemble the entire pack, align wording for the RO certification, and guide your QAAMS upload.

Related reading